There are a lot of flash cms templates .
.
Infrastructures Details

a) Area and Land availability with layout plan of buildings:

Area: 10.900 Acres
Lay out plan of building is attached herewith.

b) Academic & Administrative Built up area:

Academic and Administrative:
Sl No.ParticularsExisting
  Building with RCC roof(in Sqm)Building with Sheet roof (in Sqm)
1Academic/Institutional area45541880
2Administrative area1250****
3Amenities and students facilities1850****
4Others2450350
 Total Area (in sqm)101042230

c) Detail Institutional Area for existing program:

Sl No.ParticularsExistingProposed (likely to be completed before Jan.2011
  NumberApprox. area of each (sqm)Total Area (sqm) NumberApprox. area of each (sqm)Total Area (sqm)
1Class room18661188   
2Tutorial room0636216   
3Seminar Hall02175350   
4Drawing Hall02175350   
5Computer Centre01150150   
6Library01400400   
7LaboratoriesIncluding Computer Lab. (excluding Computer Centre)201002000   
8Workshop061801800   
9Others (Reading Room & Common Room)   02 310
 Total Area (in sqm)  6534   

d) Residential Built up area:

Sl No.ParticularsExisting
  Building with RCC roof(in Sqm)Building with Sheet roof (in Sqm)
1Hostel for Boys12600330
2Hostel for Girls1100100
3Staff Quarters195****
4Others********
 Total Area (in sqm)13895430

e) Details of Lab and major equipments:

List of laboratories
Name of the Laboratory/Workshop
Civil Engineering Lab
Survey Store
Basic Electrical Engg
Electrical Engg Lab
Thermal/HP Lab
CNC Lab
Hydraulic & Hydraulic M/c Lab
Material Testing Lab
Machine Shop
Fitting & Carpentry Shop
Welding Shop
Foundry & Blacksmith Shop
Analog & Digital Electronics Lab
Communication & Power Etc Lab
Microprocessor Lab
Basic Electronics Lab
Computer Application Lab
Advance Computer Lab
Engg Physics Lab
Engg Chemistry Lab

more

.